ASOS office fit out project

ASOS

Joinery delivered

  • Bespoke servery area
  • Tea and coffee points
  • Replacement internal doors
  • Specialist waste recycling units
  • Full height Alto laminate toilet cubicles
  • Quartz Caesarstone vanity tops.

Client

ASOS

M/C

ISG

Architect

Spacelab

Timeframe

Three months on site

ASOS office fit out project

The online fashion retailer, which was originally set up in London in 2000 has since grown to become the global force it is today – with more than 16 million active customers last year. Its dedicated customer services office in Leaveden has been fully refurbished by ISG and Spacelab.

During the project, which took 12 weeks, we fitted out five floors of the building with high specification bespoke joinery works to complement the design-led creative interior décor.

Some of the key features of the design were the bespoke servery area for the ground floor, along with the bespoke servery units plus tea and coffee points on the first to fourth floors. The sleek new units feature stone tops, birch wood laminated doors and architectural powder-coated metal frames above incorporating feature lighting.

We delivered replacement internal doors and specialist waste recycling units on all floors of the building. The team also installed full height Alto laminate toilet cubicles and quartz Caesarstone vanity tops in the new washrooms on each floor as part of the project.

More projects

See all projects

© 2019 Cre8 Joinery Solutions. Cre8 Joinery Solutions is a trading style of Washroom Joinery LLP.

Registered in England OC 325 205. VAT No: 919 3091 17. Registered Address: Units 1-7 Hill Farm, Epping Lane, Abridge, Essex RM4 1TU.